Project  Proposals implemented at Grama Niladari Division Level in the year 2025 

NO      DIVISION  PROJECTS  AMOUNT
 01  94 C   Kuttiyawatta  Extension of asphalt surfacing and development from the already asphalted section near the residence of Mr. K.M.G. Ranjith on the Kuttiyawatta–Pinikahana main road.

Renovation works of the Nilasewana - Installation of a safty fence

 826446.28

931,866.72

 

 02  223 C Paranajanapadaya  Concreting the remaining section of the road in front of the Thalawatta Cemetery, in the Parana Janapadaya Grama Niladhari Division

Developing the section from near Mr. Surendra’s residence up to Kanda Uda Layama by laying interlocking paving stones

Construction of the Shrine Room of Divithura Vivekananda Tamil Maha Vidyalaya

Construction of toilets at the Nilasewana, plastering of walls, and preparation of the pavement

Repairing the ceiling and painting the walls of the Official Residence

Repairing the rain gutters, installing an internal sink, and repairing the roof

 1,157024.80

1,407060.80

645,471.26

382,475.07

1,286,676.85

131,919.12

 03  193 C Nabaratta

 Renovation works of the Nilasewana – Installation of a water pump for the tube well

Concreting the damaged section of the Nambaraatta Main Road, from near the Buddha statue

212,765.10 

950,413.22

 04  192 Ampegama

 Development of Kammalgoda Road (First Cross Road) in the Peduru C Janapadaya, within the Ampegama Grama Niladhari Division, by laying interlocking paving stones

Developing the entrance road of the Nilasewana by laying interlocking paving stones

Repairing the roof of the Nilasewana

 1,198,347.11

784,465.91

53,652.00

 05  94 B Polgahavila  Repair works of the roof and plumbing system of the Nilasewana  212,765.10
 06  223 A  Divithura East

 Interlocking the remaining section of the Akkara Dahathamara Road

Construction of the sports hall at Wathugaha Induhena Public Playground

Development of the Divithura East Egodawatta Road

 1,652892.56

954,044.34

702,049.89

 07  196 A Wadu South  Interlocking the road from near Nilkaduru Tea Factory, along the Ganga Aina Road, onwards  1,652,892.56
08 196 C Wadu North

Repairing the electrical system and window panes of the Divisional Secretariat office building

Repairing the water pump, roof, electrical system, and window panes of the Grama Secretariat office building.

Development of the connecting road from near the Hettiyagama house in North Madakadaha, Waduwelvitiya.

32,845.00

67,473.00

1,002,495.15

09 197 Agaliya

Concreting the road from the completed section near Galpotha Watta Junction up to the residence of Mrs. W.P. Nisansala. Sanjivani

Concreting approximately 50 meters of the Agaliya Middle Road from near Galpotha Watta Tea Factory onwards

866,876.35

574,796.14

10 193 B Maddevila

 Concreting approximately 130 meters of the road from the residence of M.r.K.D. Samantha in Maddewila Millattavila onwards

Development of the road from near Mrs. Shimathi Mallika’s residence up to near Mrs. Malani Bandula Hewa’s residence

 1,477,854.01

899,687.26

11 196 Pathawelivitiya  Repairing two latrines and four window panes at the Nilasewana, restoring the water supply, and renovating the electrical system  822,957.07


 